Geological Engineering Services for California's Bay Area
Geological Engineering Services for California's Bay AreaGeological Engineering Services for California's Bay AreaGeological Engineering Services for California's Bay AreaGeological Engineering Services for California's Bay AreaGeological Engineering Services for California's Bay AreaGeological Engineering Services for California's Bay Area
Geological Engineering Services for California's Bay Area
Geological Engineering Services for California's Bay Area
Geological Engineering Services for California's Bay Area
Geological Engineering Services for California's Bay Area
Geological Engineering Services for California's Bay Area
Geological Engineering Services for California's Bay Area

PROJECTS

Public Works Projects

El Granada Transmission Pipeline Replacement Project, Highway One, Half Moon Bay for Coastside County Water District. Geotechnical investigation and construction services for jack and bore pit installations at force main creek crossings

Replacement Tank Project, Skyline Boulevard  for Skyline County Water District. Geotechnical design and construction services for replacement of 0.2 MG  redwood storage tank with new steel tank

Skyline Tank No.2, San Bruno for Westborough County Water District. Geotechnical and slope stability investigation and construction observation and testing services for new 1.5 MG water storage tank.

La Cresta Water Tank Replacement Project, Los Altos Hills for Purissima Hills Water District. Geotechnical and causation investigation for .9 MG Concrete water storage tank failure diuring the 1989 Loma Prieta Earthquake, recommendations and  construction observation and testing  for new steel tank

El Monte Fire Station, Foothill College, Los Altos Hills, Ca. for Los Altos Fire District. Geotechnical site selection, design and construction services for new fire house facility

Skylonda Fire Station, San Mateo County, Ca for the County of San Mateo. Geotechnical design services for proposed fire station replacement barracks and office building

Proposed Force Water Main for Los Altos Hills Fire District At Horseshoe Lane. Geotechnical and rock excavatability investigation for new 12 inch ductile iron pipe line

Neary Tank No.2, Los Altos Hills for Purissima Hills Water District. Geotechnical investigation for slope retaining structure below tank, construction observation and testing

Water Storage Tank, Santa Lucia Preserve, Monterey County for Rancho San Carlos Partnership. Geotechnical Investigation  for .58 MG water storage tank

Stevens Canyon Road Widening, Cupertino, Ca. for the City of Cupertino. Geotechnical design and Construction Services

Geological Engineering Services for California's Bay Area
Home Page | About Us | Geotechnical Services | Our Experience | Contact Info | Terms Of Use | Site Credits
Cleary Consultants, Inc. provides geotechnical and geological engineering services
for the Greater San Francisco Bay Area and other Northern California communities.

© Copyright 2018 Cleary Consultants, Inc.
560 Division Street, Campbell, California 95008
Ph: 650-948-0574 | E-Mail: info@clearyconsultantsinc.com